|
REBUILDING,
RETROFITTING AND RE-ENGINEERING MACHINE TOOLS At
Curtis Machine Tools Ltd, machine tools are rebuilt , retrofitted and re-engineered. Advice is
always available to help make a decision as to which option will best suit your
circumstances.
Rebuilding: restoring a machine as closely as possible to its original
specification.
Retrofitting: adding new control components or subsystems (e.g. CNC), to
improve the performance and flexibility of a machine. It can also simplify the operating
procedures and reduce the level of supervision required.
Re-engineering: to redesign and build a new machine using selected
components from the original. The new machine will have improved performance, additional
capabilities and is often customized to suit a particular application.
|
 BEFORE RE-ENGINEERING: 20 year old Swiss made cylindrical grinding machine with
manual / hydraulic cam operated axes and relay controls. |
|
 AFTER RE-ENGINEERING: The
machine elements were stiffened for greater precision and faster traverse speeds. CNC was
added together with a new workpiece handling system, gauging station, palletiser and
state-of-the-art servo systems. The result, a revitalized and customized machine tool that
will be competitive for many years. |
| ADVANTAGES OF RE-ENGINEERING With ever increasing production rates and new cutting technologies, some machine
tools can reach the end of their competitive lives long before they are mechanically
redundant. In these situations it can be necessary to go beyond rebuilding or retrofitting
and re-engineer the machine tool.
Having an old machine tool re-engineered has three main advantages.
 | PERFORMANCE: best practice production processes can be
introduced to match or exceed the performance available from new standard
equipment. Sub-processes can be added, e.g. deburring, auto feeding, gauging and handling,
etc., to reduce cycle times, component costs and floor space requirements. |
 | COSTS: when comparing the cost of a re-engineered machine with equipment
of comparable performance and capabilities, substantial savings often result; especially
when production rates are very high or the component is of a specialist or unusual nature. |
 | ONE YEAR WRITE-OFF: in accounting terms, re-engineering costs can
legitimately be classified as refurbishment and written-off in one year.
|
|
|
 | SERVICES PROVIDED
 | Design - mechanical, electrical and software designed in-house. |
 | Build - highly competent work-force with traditional and new technology
skills. |
 | Documentation - comprehensive manuals covering safety, maintenance and
operation. |
 | Installation - full installation and commissioning service |
 | After Sales - full customer support from process validation to ongoing
maintenance and repair services. |
|
|
 BEFORE RE-ENGINEERING
30 year old machine as received. |
|
 AFTER RE-ENGINEERING
The objective was to improve reliability, increase the cutting speed and reduce changeover
times. These objectives were achieved by using state-of-the-art CNC techniques with user
friendly dialogue screen guides for setting and operating. |
QUOTATIONS AND ENQUIRIES
To obtain a quotation for rebuilding, retrofitting or re-engineering a
machine tool, please telephone to briefly outline your requirements.
Alternatively, click on the enquiry form button below and complete the
simple form that follows. We will then make
arrangements to inspect the machine and discuss its new specification. Tel: 01206 230032

TOP OF PAGE |
|